
Piling Begins
29 | 01 | 2022
29 | 01 | 2022 Coils of clay extracted from up to 18 metres deep as a result of the piled process. This is where a contiguous series of holes are formed which are then reinforced with steel and concrete and used as a retaining structure forming part of the groundwork’s.